We Inaugurate the Los Maitenes Solar Park and Surpass US$ 300 Million in Projects
- fcosmelli
- Nov 14, 2025
- 1 min read
The new Los Maitenes Solar Park in Pirque is the first in the Metropolitan Region with the capacity to operate 24/7 using 100% renewable energy, reinforcing our expansion in the country's central-south with a total project portfolio already reaching US$ 300 million.

We are proud to announce a momentous achievement for renewable energy in Chile: the inauguration of our Los Maitenes Solar Park in Pirque. This event marks a milestone, as it is the first photovoltaic park in the Metropolitan Region with the capacity to be 100% renewable and deliver energy to the grid even at night.
With an investment that adds to a total project portfolio valued at US$ 300 million, Los Maitenes is not just a park; it is proof that today we can operate under a 100% renewable and sustainable energy system. Our co-founder, Felippe Custareli, highlighted that this site will generate 25 GWh annually, reinforcing our conviction in the potential of the central-south region of the country.

Our Commitment to the Energy Future
The Los Maitenes Solar Park is the spearhead of an ambitious growth strategy. We are currently constructing four additional plants in Chile's central-south area, all equipped with battery systems. Together with Los Maitenes, these five units will generate 100 GWh annually, representing an investment of US$ 50 million aimed at strengthening the grid with clean, continuous energy.
Our vision for the future includes:
Portfolio Expansion: We are developing a pipeline of distributed generation and utility-scale projects totaling over one thousand megawatts over a five-year horizon.
Leadership in Batteries: We firmly believe in energy storage to guarantee stability and continuous dispatch.








Comments